TREASURE PROCESSING

Over six years of work resulted in a massive amount of material. It was kept in over 4000 buckets, 1000 storage boxes and 20 large trash cans. These filled 10 storage units to capacity! Transporting it to the Processing facility required 7 Double Tractor-Trailer trucks, 1 Large U-Haul Truck and 1 15-Passenger Cargo Van.

 

THE TOTAL WEIGHT EXCEEDED 525,000 POUNDS!

One of the Ten Storage Units Filled to Capacity

 Piles of Unsorted Material

 The Larger Material before Washing

The Trommel Machine Used for Washing the Stones

 Fine Material

 The Beautiful Stones After Washing